Skip to content

Poured & Troweled

Terrazzo Flooring Installation in Marietta

A sealed, aggregate floor that handles decades of foot traffic without constant upkeep or refinishing.

  • Written Estimate
  • Surface-Prep Checklist
  • Moisture Testing Included
  • Documented Handover
A stylish and spacious hallway featuring grey painted walls with white marble wainscoting, white doors with ornate frames, and a patterned terrazzo floor.

What Goes Wrong

Where terrazzo installations fail, and what a correct install does differently

Skipped Moisture Test

Undetected vapor drive under the slab breaks the epoxy resin bond, causing the floor to delaminate within months.

MVT Test Before Pour

A moisture vapor transmission test is run first; readings above the limit trigger a mitigation layer before any resin is placed.

Inadequate Slab Prep

Skipping shot blasting or grinding leaves a smooth surface the epoxy resin cannot grip, leading to early adhesion failure.

Shot Blast or Grind

Diamond grinding or shot blasting opens the slab profile so the resin and hardener mix bonds mechanically, not just chemically.

No Divider Strips Set

Without divider strips, the poured sections have no control joints, and slab movement translates directly into surface cracking.

Strip Layout First

Divider strips are positioned before the pour to define pattern sections and absorb expansion, keeping each field intact.

Uneven Trowel Finish

Inconsistent hand or power troweling leaves low spots that pool water and wear unevenly, shortening the floor’s service life.

Trowel to Flat Grade

Hand and power troweling bring each poured section to a consistent flat plane before curing, so the sealer sits evenly across the whole floor.

Scope of Work

What this installation covers

From slab assessment through sealer finish, here is what the installation sequence includes.

  • Residential Terrazzo

    Poured terrazzo for home interiors and entryways.

  • Commercial Lobby Terrazzo

    High-traffic lobby and corridor installations.

  • Remodel & Renovation Pours

    New terrazzo over existing prepared concrete slabs.

Poured & Troweled System

What terrazzo installation involves from slab prep to sealer finish

Terrazzo is a poured and troweled floor system, not a coating, the prep and pour sequence determines how long it lasts.

The installer begins with a slab assessment and moisture vapor transmission test. Older concrete slabs common in Marietta’s established neighborhoods can carry enough moisture vapor to compromise the epoxy resin bond if the issue is not addressed first. A moisture mitigation layer is specified where readings exceed acceptable limits before any other work proceeds.

Shot blasting or diamond grinding profiles the slab surface so the epoxy resin and hardener mix bonds mechanically. Divider strips are then set out to define the pattern sections and control expansion. The epoxy resin and aggregate chip mix is poured into each section, spread to a consistent depth, and worked with hand and power trowels until the surface is flat.

After curing, the floor is ground back to expose the aggregate, then progressively refined to the specified finish level. Sealer application follows, protecting the aggregate and resin matrix from surface wear and staining. Cobb County commercial lobbies and remodels are a common use case, but the same installation sequence applies to residential spaces in Marietta Square historic homes.

Request Your Estimate

Why Choose Us

Why choose our partners for terrazzo installation in Marietta?

Every job is backed by a documented process, from the first slab check to the final signed handover.

  1. Itemized Written Estimate

    Every quote lists materials, layer thickness, and cure times in writing before any work is booked.

  2. Surface-Prep Checklist on Every Job

    Grinding, degreasing, and crack repair are documented on a checklist so nothing is skipped before the pour.

  3. Moisture Testing on Every Slab

    A vapor transmission test is run before work starts, not assumed, so the resin bond is not left to chance.

  4. Curing Inspection & Documented Handover

    The finished floor is inspected at cure and signed off in writing, giving you a record of what was installed.

  5. Local Slab Knowledge

    Partners are familiar with Marietta slab conditions and schedule around Georgia’s humidity to protect cure times.

A stylish and spacious hallway featuring grey painted walls with white marble wainscoting, white doors with ornate frames, and a patterned terrazzo floor.
A tradesperson in yellow safety boots stands in wet, self-levelling screed, with a hose pouring more material and a levelling tool visible.

How It Works

From first enquiry to finished floor in three steps

  1. 01

    Request Your Estimate

    Tell us about your slab and space, and we’ll arrange a local installer to assess the site and provide a written itemized quote.

  2. 02

    Confirm Prep & Schedule

    Once you approve the estimate, the installer completes the surface-prep checklist, grinding, degrease, moisture test, before the pour date is set.

  3. 03

    Pour, Trowel & Hand Over

    The terrazzo is poured, troweled flat, ground to finish, and sealed, then signed off with a documented curing inspection at handover.

Pricing Estimates

Typical Terrazzo Flooring Installation Prices

JobTypical cost
Basic terrazzo installation$12-$20 per sq ft
Midrange terrazzo installation$18-$30 per sq ft
Decorative terrazzo installation$25-$40 per sq ft
These prices are estimates and often vary with the condition, size and scope of each job. Message or call us for a free, no-obligation quote.
See all prices

Common Questions

Questions about terrazzo flooring installation in Marietta

  • What is the difference between cement-based and epoxy-based terrazzo?

    Cement-based terrazzo is more porous and can absorb moisture over time. Epoxy-based systems bond directly to the slab, resist moisture and are better suited to Marietta’s humid conditions. The estimate specifies which binder is recommended for your slab.

  • How thick is a poured terrazzo floor?

    Epoxy-based terrazzo is typically poured at 3/8 to 1/2 inch. Cement-based systems are thicker, often 1.75 inches or more. The exact depth is listed in your written estimate before any work is scheduled.

  • What happens if the slab is not properly prepared before pouring?

    Pouring over a contaminated or cracked slab causes the binder to delaminate, sometimes within months. Fixing a failed pour means removing the entire layer and starting over, which costs significantly more than correct prep the first time.

  • How long does terrazzo take to cure before it can be walked on?

    Epoxy-based terrazzo is typically ready for light foot traffic within 24 to 48 hours, with full cure taking several days. Cure times vary by binder type and ambient humidity, your estimate will state the specific timeline for your job.

  • Can terrazzo be installed over an existing concrete slab?

    Yes, provided the slab is structurally sound, flat and free of active cracks. The installer grinds and degrease the surface first. Significant cracks or height variations are repaired before the pour, those steps appear on the prep checklist.

  • Does terrazzo require ongoing maintenance after installation?

    Sealed terrazzo needs periodic resealing, typically every few years depending on traffic. Epoxy-based surfaces are less porous and easier to maintain. The handover document notes the sealer type used so future maintenance matches the original specification.

More questions about Terrazzo Flooring Installation?

Get an Itemized Estimate for Your Floor

Tell us about the slab and we’ll arrange a local installer to assess it and quote materials, layer thickness, and cure times in writing.

Request Your Estimate